Pune Metro Line 3 Update 2026: Prime Minister Narendra Modi is scheduled to inaugurate Pune Metro's 23.2-km Pink Line on November 3, 2026, at 12:30 PM through video conferencing. Passenger services are expected to begin on November 4, initially covering 17 of the corridor's 23 stations. The new metro line will connect Maan and the Hinjewadi IT hub with Shivajinagar, offering an alternative to road travel for thousands of daily commuters.
The inauguration is part of a larger ₹21,800-crore metro infrastructure program for Pune. Along with opening the Pink Line, the Prime Minister will lay the foundation stone for four additional metro corridors under Pune Metro Phase-II.
Pune Metro Pink Line 2026: Key Details
Particulars | Details |
|---|---|
Metro project | Pune Metro Line 3 (Pink Line) |
Inauguration date | November 3, 2026 |
Inauguration time | 12:30 PM IST |
Passenger services scheduled | November 4, 2026 |
Total route length | Approximately 23.2 km |
Total stations | 23 |
Stations in initial operations | 17 |
Starting point | Maan |
Ending point | District Court Metro Station |
Major connectivity | Hinjewadi IT Park to Shivajinagar |
Project cost | Approximately ₹8,313 crore |
Peak-hour train frequency | Every 6 minutes |
Non-peak frequency | Every 12 minutes |
Operating company | Pune IT City Metro Rail Limited |
Pune Metro Line 3 Route: Maan to District Court
The new Pink Line will connect Maan with District Court Metro Station through Hinjewadi, Balewadi, Aundh and the Shivajinagar area.The corridor is particularly important for people working in Hinjewadi's Rajiv Gandhi Infotech Park, one of Pune's major employment centers. Commuters traveling between Hinjewadi and central Pune currently depend heavily on road transport.

The new metro service is expected to provide a more predictable commuting option while reducing dependence on private vehicles.The Pink Line will also connect with Pune's existing metro network, allowing passengers to travel between different parts of the city through interchange facilities.
Pune Metro Pink Line Stations Opening on November 4
According to the project details reported ahead of the inauguration, passenger operations will initially begin at 17 of the corridor's 23 stations.
Ten stations are expected to have both staircases available during the initial phase.
Station or Location | Initial Access Details |
|---|---|
Hinjewadi Phase 2 Circle 2 | Both staircases |
Chhatrapati Shivaji Maharaj Chowk, Hinjewadi | Both staircases |
Hinjewadi Phase 1 | Both staircases |
Wakad Chowk | Both staircases |
Shri Shiv Chhatrapati Sports Complex, Mahalunge | Both staircases |
MITCON, Balewadi | Both staircases |
RK Laxman Museum, Balewadi | Both staircases |
Aundh | Both staircases |
Sakalnagar | Both staircases |
Savitribai Phule Pune University | Both staircases |
Seven other stations in the initial operating section are expected to have one staircase available.
The remaining six stations are planned to become operational in phases. Two are expected to be completed by the end of November 2026, while four others are targeted for completion by January 2027.
Passengers should check the final operational station list before planning their journey.
Pune Metro Pink Line Timings and Train Frequency
The Pink Line is expected to operate trains at intervals of six minutes during peak hours and 12 minutes during non-peak hours.
According to the operating schedule reported ahead of the launch:
Last train from Maan: 10:30 PM
Last train from District Court: 11:40 PM
Peak-hour frequency: Every 6 minutes
Non-peak frequency: Every 12 minutes
These timings are based on the pre-launch announcement and may be revised when commercial services begin.
Pune Metro Pink Line Ticket Price
The final fare chart for the Pink Line has not been specified in the government announcement or the project details reviewed for this report.
A common mobile ticketing application has reportedly been developed to support travel across the Pink Line and the existing Maha Metro network.Passengers are advised to check the officially published fare structure before purchasing tickets.
Women Train Operators to Run Pune Metro Pink Line
One of the major features of Pune Metro Line 3 is its focus on women's participation in public transportation. According to the Prime Minister's Office, the Pink Line will be operated entirely by women train operators.
The project also includes a sustainability initiative under which approximately 30% of its total electricity requirements are planned to be met through solar power.These measures are intended to support gender inclusion and reduce the environmental impact of urban transportation.
Pune Metro Phase-II: Four New Lines Worth ₹13,500 Crore
The November 3 program will also include the foundation stone laying for Pune Metro Phase-II, involving an estimated investment of ₹13,500 crore.
The expansion will introduce four additional metro corridors designed to connect residential neighborhoods, commercial centers and employment hubs.
Metro Line | Route | Length |
|---|---|---|
Line 2A | Vanaz to Chandani Chowk | Part of combined 12.75 km |
Line 2B | Ramwadi to Vitthalwadi | Part of combined 12.75 km |
Line 4 | Kharadi to Khadakwasla | 25.52 km |
Line 4A | Nal Stop to Manik Baug | 6.12 km |
Lines 2A and 2B together will cover approximately 12.75 km, extending Pune's existing east-west metro network.
Line 4 will connect Kharadi with Khadakwasla, while Line 4A will provide connectivity between Nal Stop and Manik Baug.The expansion is expected to improve transport access to areas including Hadapsar, Magarpatta, Swargate, Warje, Nanded City and Pune Cantonment.
The new corridors are also planned to integrate with the existing metro system and intercity bus services through interchange facilities at locations including Swargate, Nal Stop and Kharadi Bypass.
How Pune Metro Pink Line Will Benefit Hinjewadi IT Employees
The Hinjewadi IT corridor attracts large numbers of employees traveling from different parts of Pune.The Pink Line is expected to improve commuting options in several ways.
First, metro connectivity between Hinjewadi and Shivajinagar will offer an alternative to congested roads.
Second, integration with the existing metro network will help passengers reach additional destinations without relying entirely on private transport. Third, frequent train services during peak hours could make daily travel more convenient for office workers and other commuters.
However, actual travel-time savings will depend on the final operating timetable, interchange arrangements and access to individual stations.
Pune Metro Line 3 Developed Under Public-Private Partnership
Pune Metro Line 3 has been developed under a Public-Private Partnership (PPP) model using the Design, Build, Finance, Operate and Transfer framework.
The project is being implemented by Pune IT City Metro Rail Limited under a concession agreement with the Pune Metropolitan Region Development Authority. The corridor has also undergone railway safety inspections, with approvals for its initial operational sections reported during July and September 2026.
What Happens Next?
The inauguration of Pune Metro Line 3 is scheduled for November 3, followed by the planned start of passenger services on November 4. The initial opening will cover 17 stations, while work on the remaining stations is expected to continue over the following months.
For Pune residents, particularly those traveling between Hinjewadi and Shivajinagar, the new Pink Line represents a significant expansion of the city's public transport network.The upcoming Phase-II corridors are expected to further strengthen connectivity across Pune as the projects progress.




